Coleman 5151C Specifikace Strana 15

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 28
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 14
15
DGAT & DGAM SERIES FURNACES
Installation Procedure for DGAT & DGAM
Furnaces
The following steps are listed for installation of furnace and
need not be performed in the exact order as listed:
Follow this procedure to avoid serious misalignment of fur-
nace duct connector opening and supply duct.
A. This Furnace requires NO sub--base
For convenience, a template is provided on the furnace
shipping carton. This may be cut out and used to accu-
rately locate furnace, floor and vent openings. See
Figure 12.
Locate template on floor to provide proper clearances to
the walls and the front. Cut 2” diameter hole or small
square hole as indicated on template.
Locate template so that furnace opening outline is cen-
tered over under--floor supply duct as accurately as pos-
sible. This is important because of the limited adjust-
ment from side to side, and from front to rear of the duct
connector.
Locate under--floor duct through hole and center “floor
cut--out opening” on template over duct.
Accurately cut “floor cut--out opening” from template,
mark floor opening, remove template and cut floor on
outside edge of marked line.
Duct connectors will fit opening in any one of four (4) posi-
tions. Place proper duct connector in the opening in the best
position, (duct connector may be shifted in either direction
for best location).
Mark duct opening with a scribe or marking pen, then re-
move duct connector. Cut hole in duct to correct size accord-
ing to dimensions shown in Figure 11. Cut duct accurately to
prevent air leakage.
Reinstall duct connector with tabs inside of hole in the duct
and bend tabs up firmly against underneath side of duct.
Secure duct connector to floor with four (4) sheet metal
screws using holes provided in the connector. See
Figure 14.
B. Install Furnace
Remove panel from air conditioning compartment.
Check to make sure roof jack is not extending too far
down into furnace location. Slide furnace into location
and align over floor opening.
Pre--cut openings and knock--outs are provided in fur-
nace base to install a front fuel line and/or front refriger-
ant lines. If rear entrance lines are to be used, they
must be installed before the duct connector is in -
stalled and secured in place.
For air conditioning lines, remove the knock--out.
C. Securing Furnace
Make any minor adjustments in the furnace location
necessary to insure that the opening in the furnace bot-
tom is centered over the opening in the duct. Secure fur-
nace to floor, as required, through holes at front and rear
of furnace. Holes for screws are located in bottom flange
front corners and rear flanges.
Secure furnace to wall at top by using metal strap pro-
vided. (See Figure 14.)
Manufacturers may add straps equivalent to provided
straps, if required, for securing furnace to structural
member.
SUPPLY DUCT
OPENING
Fuel Line
Opening
Use screw holes in furnace
base to fasten to duct connec-
tor (relative to position of duct
connector) .
Secure furnace to duct
connector base with 4
screws.
Refrigerant
Line Opening
Furnace
Base
Bend tabs of
duct connector
under duct
opening to se-
cure to the sup-
ply duct.
TABS TABS
DUCT DUCT
1. Insert Duct Plenum
Connector Into Duct
Cut--out.
2. Bend Bottom Tabs Over
And Onto The Underneath
Duct Service.
Figure 14 Duct Connector
Zobrazit stránku 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 27 28

Komentáře k této Příručce

Žádné komentáře